Concrete Calculator — Cubic Yards, Cubic Metres & Bags
Work out how much concrete you need for a slab, wall, footing or round column in cubic yards or cubic metres, with premix bag counts, weight and cost.
Enter the size of what you are pouring and this concrete calculator tells you how much to order: cubic yards or cubic metres of ready-mix, or the number of premixed bags for a small job. It handles rectangular pours such as slabs, patios, walls and footings, and round ones such as columns, piers and post holes, and adds a waste allowance to model the extra quantity you specify.
How to use this tool
- Choose US units (feet and inches) or metric (metres and centimetres).
- Pick the shape: a rectangle for slabs, walls and footings, or a cylinder for columns and holes.
- Enter the dimensions and how many identical pours there are.
- Set the waste allowance and, if you like, the ready-mix price.
- Read the volume to order, the bag counts and the approximate weight.
Formula
Rectangle: V = L × W × T · Cylinder: V = π × (D ÷ 2)² × H · Order = V × pours × (1 + waste %)
Convert every dimension to one unit first: inches ÷ 12 gives feet and centimetres ÷ 100 gives metres. Cubic feet ÷ 27 gives cubic yards. Bag counts use the manufacturer yields of 0.30 ft³ for a 40 lb bag up to 0.60 ft³ for an 80 lb bag and are always rounded up to whole bags.
Example
A 10 × 10 ft patio poured 4 in thick is 10 × 10 × 0.333 = 33.33 ft³, or 1.23 yd³. With 10% extra that becomes 1.36 yd³ (36.67 ft³). Mixing it yourself would take 62 bags of 80 lb premix or 82 bags of 60 lb, and the wet concrete weighs roughly 5,490 lb. At $150 per yard, the ready-mix costs about $204 before any fees excluded from that unit price.
Frequently asked questions
How many bags of concrete make a cubic yard?
A cubic yard is 27 ft³: it takes 45 bags yielding 0.60 ft³ each or 60 bags yielding 0.45 ft³ each, before waste. Other products can have different yields; check their labels.
How much extra concrete should I order?
Enter an allowance based on actual excavation, form tolerances and your supplier’s advice. The default 10% is a planning assumption, not a guarantee. Measure irregular areas separately before adding waste.
How do I enter a wall?
Use the rectangle shape: the wall length as Length, the wall height as Width, and the wall thickness as Thickness.
How thick should a slab be?
Enter the thickness specified for your project. This tool calculates volume from dimensions; it does not choose slab thickness, reinforcement, foundations or load capacity.
Sources
Last updated: 2026-10-30